Field Measure Checklist

  1. Cabinets are secure, level, and in their final positions.
  2. Material selections have been made and approved.
  3. Self-edge selection has been made and approved.
  4. Sub-tops, if necessary, are in place and secured.
  5. Sink(s) and plumbing fixtures are on site with decisions made on fixture locations.
  6. Cook tops, ranges, downdraft units, or other items penetrating stone are on site.
  7. Electrical outlets are installed and properly located.
  8. Appliance garages, tambour door units, or other items that sit atop the counter tops are not installed.
  9. Overhangs that exceed eight inches may require additional support depending on stone selection.
  10. Projects requiring full height backsplashes must have uppers installed in their final positions.

Should you have any questions regarding the above checklist please feel free to call us.