Field Measure Checklist
- Cabinets are secure, level, and in their final positions.
- Material selections have been made and approved.
- Self-edge selection has been made and approved.
- Sub-tops, if necessary, are in place and secured.
- Sink(s) and plumbing fixtures are on site with decisions made on fixture
locations.
- Cook tops, ranges, downdraft units, or other items penetrating stone
are on site.
- Electrical outlets are installed and properly located.
- Appliance garages, tambour door units, or other items that sit atop
the counter tops are not installed.
- Overhangs that exceed eight inches may require additional support
depending on stone selection.
- Projects requiring full height backsplashes must have uppers installed
in their final positions.
Should you have any questions regarding the above checklist please feel
free to call us.
|